PLUMBING
By-laws: City of Cape Town
Certificate valid for 3 months from date of issue.
- The hot water cylinder is plumbed correctly, PRV of the correct value, vacuum breakers correctly installed, emergency overflow installed with a metallic pipe, all three overflows to be separately plumbed to the outside and discharge to atmosphere.
- The water meter registers when a tap is open and stops completely when no water is drawn. If there is no movement on the meter, this points to a defect somewhere on the property.
- None of the terminal water fittings leak and they are correctly fixed in position.
- No storm water is discharged into the sewerage system.
- There is no cross connection between the potable supply and any grey water or ground water system which may be installed.
- The water pipes in the plumbing installation are properly saddled.
- Every property must have its own water stop tap located just after the water meter to be able to isolate property water supply.
- The water stop tap before the meter is the property of the City and is not to be used by residents.
- If the tap fitting leaks out tap shaft or body only when water is activated it does not form part of necessary repairs.
- Bath/shower diverters are not part of necessary repairs.
MAINTENANCE-RELATED ITEMS WHICH DO NOT FORM PART OF THE C.O.C
- Bath-water draining too slowly.
- Toilet waste-water leaking.
- Broken toilet, or flusher handle.
- Blocked drain.